Markum Solar Farm (67580_MKM)

Markum Solar Farm is a 161.0 MW solar interconnection project in Bosque, Texas with a current status of operational.

161.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameMarkum Solar Farm
Queue ID67580_MKM
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity161.0 MW
StateTexas
CountyBosque
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-11-01
Withdrawn date—
Developer—
Utility / transmission ownerMarkum Solar Farm, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata