Marlin Solar (61513_GEN1)

Marlin Solar is a 5.3 MW solar interconnection project in Limestone, Texas with a current status of operational.

5.3 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameMarlin Solar
Queue ID61513_GEN1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity5.3 MW
StateTexas
CountyLimestone
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-12-01
Withdrawn date
Developer
Utility / transmission ownerCypress Creek Renewables

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata