Marshall Spring Solar (25INR0353)

Marshall Spring Solar is a 150.0 MW solar interconnection project in Gillespie, Texas with a current status of operational. It is proposed to connect at New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station..

150.0 MWCapacity
OperationalStatus
GillespieMarket
SolarTechnology

Project facts

Canonical nameMarshall Spring Solar
Queue ID25INR0353
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketGillespie
TechnologySolar
Capacity150.0 MW
StateTexas
CountyGillespie
Point of interconnectionNew POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.
Requested (queue) date2023-02-20
Proposed in-service date
Operational date2026-07-01
Withdrawn date
DeveloperMarshall Springs Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.