Martin 115 kV Substation (GEN-2026-SR14)
Martin 115 kV Substation is a 158.0 MW battery interconnection project in Panhandle, Texas with a current status of active. It is proposed to connect at Martin 115 kV Substation.
158.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology
Project facts
| Canonical name | Martin 115 kV Substation |
|---|---|
| Queue ID | GEN-2026-SR14 |
| Status | active |
| Source status | SPECIAL STUDY |
| Market | TX |
| Technology | Battery |
| Capacity | 158.0 MW |
| State | Texas |
| County | Panhandle |
| Point of interconnection | Martin 115 kV Substation |
| Requested (queue) date | 2026-01-16 |
| Proposed in-service date | 2028-12-29 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPS |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata