Marys Lake (517_1)

Marys Lake is a 8.1 MW other interconnection project in Larimer, Colorado with a current status of operational.

8.1 MWCapacity
OperationalStatus
WACMMarket
OtherTechnology

Project facts

Canonical nameMarys Lake
Queue ID517_1
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyOther
Capacity8.1 MW
StateColorado
CountyLarimer
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1951-05-01
Withdrawn date—
Developer—
Utility / transmission ownerU S Bureau of Reclamation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata