Marysville 345kV (AD2-096)

Marysville 345kV is a 50.0 MW battery interconnection project in Union, Ohio with a current status of suspended.

50.0 MWCapacity
SuspendedStatus
Market
BatteryTechnology

Project facts

Canonical nameMarysville 345kV
Queue IDAD2-096
Statussuspended
Source statusSuspended
Market
TechnologyBattery
Capacity50.0 MW
StateOhio
CountyUnion
Point of interconnection
Requested (queue) date2018-03-21
Proposed in-service date2026-03-20
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectsuspendedhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata