Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue (021121)

Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue is a 74.9 MW solar interconnection project in Madison County Facility, Florida with a current status of withdrawn. It is proposed to connect at Suwannee - Perry Point of Interconnection.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue
Queue ID021121
Statuswithdrawn
Source statusWithdrawn 12/31/2020 E Ss Operational Status
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyMadison County Facility
Point of interconnectionSuwannee - Perry Point of Interconnection
Requested (queue) date2018-03-27
Proposed in-service date
Operational date
Withdrawn date
DeveloperMasked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata