Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue (039494)

Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue is a 74.9 MW solar interconnection project in Gilchrist County Facility, Florida with a current status of withdrawn. It is proposed to connect at Newberry - Wilcox Point of Interconnection.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue
Queue ID039494
Statuswithdrawn
Source statusWithdrawn E Ss Operational Status
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyGilchrist County Facility
Point of interconnectionNewberry - Wilcox Point of Interconnection
Requested (queue) date2019-06-26
Proposed in-service date2020-12-01
Operational date
Withdrawn date
DeveloperMasked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata