Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue (226996)
Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue is a 74.5 MW solar interconnection project in Osceola County Facility, Florida with a current status of withdrawn. It is proposed to connect at Whippoorwill Switching Station Point of Interconnection.
74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue |
|---|---|
| Queue ID | 226996 |
| Status | withdrawn |
| Source status | Withdrawn 12/31/2024 E Ss Operational Status |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Osceola County Facility |
| Point of interconnection | Whippoorwill Switching Station Point of Interconnection |
| Requested (queue) date | 2022-01-19 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Masked Clu Gs rt oe ur pSub Inte Cr uco stn on mec et rion Queue |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata