Masked (009414)
Masked is a 21.0 MW gas interconnection project in Durham, North Carolina with a current status of withdrawn. It is proposed to connect at Duke University Main.
21.0 MWCapacity
WithdrawnStatus
NCMarket
GasTechnology
Project facts
| Canonical name | Masked |
|---|---|
| Queue ID | 009414 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NC |
| Technology | Gas |
| Capacity | 21.0 MW |
| State | North Carolina |
| County | Durham |
| Point of interconnection | Duke University Main |
| Requested (queue) date | 2016-03-04 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata