Masked (009637)

Masked is a 60.0 MW solar interconnection project in Union, North Carolina with a current status of operational. It is proposed to connect at N/A.

60.0 MWCapacity
OperationalStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID009637
Statusoperational
Source statusCommercial Operation
MarketNC
TechnologySolar
Capacity60.0 MW
StateNorth Carolina
CountyUnion
Point of interconnectionN/A
Requested (queue) date2015-04-28
Proposed in-service date
Operational date2017-03-29
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-24developerMonroe Solar FarmMaskedlow
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata