Masked (012035)

Masked is a 80.0 MW solar interconnection project in Davie, North Carolina with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID012035
Statuswithdrawn
Source statusCancelled/Terminated
MarketNC
TechnologySolar
Capacity80.0 MW
StateNorth Carolina
CountyDavie
Point of interconnection
Requested (queue) date2012-06-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata