Masked (017278)

Masked is a 55.0 MW solar interconnection project in Rockingham, North Carolina with a current status of withdrawn. It is proposed to connect at N/A.

55.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID017278
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity55.0 MW
StateNorth Carolina
CountyRockingham
Point of interconnectionN/A
Requested (queue) date2017-08-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata