Masked is a 75.0 MW solar interconnection project in Davidson, North Carolina with a current status of withdrawn. It is proposed to connect at High Point 100 kV.

75.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID038084
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity75.0 MW
StateNorth Carolina
CountyDavidson
Point of interconnectionHigh Point 100 kV
Requested (queue) date2019-06-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata