Masked (983311)
Masked is a 35.0 MW solar interconnection project in Anderson, South Carolina with a current status of withdrawn. It is proposed to connect at Toxaway Bl 100 kV.
35.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology
Project facts
| Canonical name | Masked |
|---|---|
| Queue ID | 983311 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | SC |
| Technology | Solar |
| Capacity | 35.0 MW |
| State | South Carolina |
| County | Anderson |
| Point of interconnection | Toxaway Bl 100 kV |
| Requested (queue) date | 2025-09-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata