Masked (004867)
Masked is a 80.0 MW solar interconnection project in Brunswick, North Carolina with a current status of withdrawn. It is proposed to connect at BNP2-Wallace 230kV.
80.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology
Project facts
| Canonical name | Masked |
|---|---|
| Queue ID | 004867 |
| Status | withdrawn |
| Source status | Cancelled/Terminated |
| Market | NC |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | North Carolina |
| County | Brunswick |
| Point of interconnection | BNP2-Wallace 230kV |
| Requested (queue) date | 2014-01-17 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.