Masked (004867)

Masked is a 80.0 MW solar interconnection project in Brunswick, North Carolina with a current status of withdrawn. It is proposed to connect at BNP2-Wallace 230kV.

80.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID004867
Statuswithdrawn
Source statusCancelled/Terminated
MarketNC
TechnologySolar
Capacity80.0 MW
StateNorth Carolina
CountyBrunswick
Point of interconnectionBNP2-Wallace 230kV
Requested (queue) date2014-01-17
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata