Masked (026829)

Masked is a 50.0 MW solar interconnection project in Johnston, North Carolina with a current status of withdrawn. It is proposed to connect at Selma-Four Oaks 230kV.

50.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID026829
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity50.0 MW
StateNorth Carolina
CountyJohnston
Point of interconnectionSelma-Four Oaks 230kV
Requested (queue) date2018-12-26
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata