Masked (977454)

Masked is a 990.0 MW gas interconnection project in Anson, North Carolina with a current status of active. It is proposed to connect at Lilesville 230KV Switching Station.

990.0 MWCapacity
ActiveStatus
NCMarket
GasTechnology

Project facts

Canonical nameMasked
Queue ID977454
Statusactive
Source statusFacility Study
MarketNC
TechnologyGas
Capacity990.0 MW
StateNorth Carolina
CountyAnson
Point of interconnectionLilesville 230KV Switching Station
Requested (queue) date2025-06-24
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.