Masked (983675)

Masked is a 70.0 MW solar interconnection project in Onslow, North Carolina with a current status of withdrawn. It is proposed to connect at JACKSONVILLE - WALLACE 230KV.

70.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID983675
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity70.0 MW
StateNorth Carolina
CountyOnslow
Point of interconnectionJACKSONVILLE - WALLACE 230KV
Requested (queue) date2025-09-29
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.