Masked FRP C So olu lam rb Lia CCounty (027082)

Masked FRP C So olu lam rb Lia CCounty is a 74.5 MW solar interconnection project in Columbia, Florida with a current status of withdrawn. It is proposed to connect at Newberry Substation.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked FRP C So olu lam rb Lia CCounty
Queue ID027082
Statuswithdrawn
Source statusWithdrawn 12/31/2018 mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyColumbia
Point of interconnectionNewberry Substation
Requested (queue) date2016-12-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperMasked FRP C So olu lam rb Lia CCounty
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata