Masked FRP G Sa od ls ad r,e Ln C County (116726)

Masked FRP G Sa od ls ad r,e Ln C County is a 74.5 MW solar interconnection project in Manatee, Florida with a current status of withdrawn. It is proposed to connect at Myakka Tap 69kV.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked FRP G Sa od ls ad r,e Ln C County
Queue ID116726
Statuswithdrawn
Source statusWithdrawn 12/31/2022 rn et ee mrc eo nn tn -e Pc et nio dn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyManatee
Point of interconnectionMyakka Tap 69kV
Requested (queue) date2020-06-02
Proposed in-service date
Operational date
Withdrawn date
DeveloperMasked FRP G Sa od ls ad r,e Ln C County
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.