Masked Inv Den eve erg loy S mol ea nr P Lr Lo Cject (020364)

Masked Inv Den eve erg loy S mol ea nr P Lr Lo Cject is a 25.0 MW solar interconnection project in Lake, Florida with a current status of withdrawn. It is proposed to connect at Leesburg Substation.

25.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked Inv Den eve erg loy S mol ea nr P Lr Lo Cject
Queue ID020364
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity25.0 MW
StateFlorida
CountyLake
Point of interconnectionLeesburg Substation
Requested (queue) date2017-08-11
Proposed in-service date2019-10-01
Operational date
Withdrawn date
DeveloperMasked Inv Den eve erg loy S mol ea nr P Lr Lo Cject
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata