Masked Leew Ea nr ed gR ye n Le Lw Cable (024243)

Masked Leew Ea nr ed gR ye n Le Lw Cable is a 74.5 MW solar interconnection project in Sumter, Florida with a current status of withdrawn. It is proposed to connect at Bushnell East Substation.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameMasked Leew Ea nr ed gR ye n Le Lw Cable
Queue ID024243
Statuswithdrawn
Source statusWithdrawn 12/30/2020
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountySumter
Point of interconnectionBushnell East Substation
Requested (queue) date2018-07-06
Proposed in-service date
Operational date
Withdrawn date
DeveloperMasked Leew Ea nr ed gR ye n Le Lw Cable
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata