Mason 138 kV Substation (J1454)

Mason 138 kV Substation is a 58.5 MW wind interconnection project in Mason County, Illinois with a current status of operational. It is proposed to connect at Mason 138 kV Substation.

58.5 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameMason 138 kV Substation
Queue IDJ1454
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity58.5 MW
StateIllinois
CountyMason County
Point of interconnectionMason 138 kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2022-04-30
Operational date2022-04-30
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata