Mason Substation 138 kV Bus is a 144.0 MW wind interconnection project in Mason County, Illinois with a current status of operational. It is proposed to connect at Mason Substation 138 kV Bus.

144.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameMason Substation 138 kV Bus
Queue IDJ1055
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity144.0 MW
StateIllinois
CountyMason County
Point of interconnectionMason Substation 138 kV Bus
Requested (queue) date2018-03-12
Proposed in-service date2020-09-30
Operational date2020-09-30
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.