Mass Power Increase (344)

Mass Power Increase is a 5.0 MW gas interconnection project in Hampden, Massachusetts with a current status of operational. It is proposed to connect at NU 115 kV Shawanigan.

5.0 MWCapacity
OperationalStatus
WMAMarket
GasTechnology

Project facts

Canonical nameMass Power Increase
Queue ID344
Statusoperational
Source statusC
MarketWMA
TechnologyGas
Capacity5.0 MW
StateMassachusetts
CountyHampden
Point of interconnectionNU 115 kV Shawanigan
Requested (queue) date2010-09-07
Proposed in-service date
Operational date2011-09-30
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata