Massac - Jordan 345kV (J2156)

Massac - Jordan 345kV is a 150.0 MW solar interconnection project in Johnson, Illinois with a current status of operational. It is proposed to connect at Massac - Jordan 345kV.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMassac - Jordan 345kV
Queue IDJ2156
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity150.0 MW
StateIllinois
CountyJohnson
Point of interconnectionMassac - Jordan 345kV
Requested (queue) date2022-06-28
Proposed in-service date2024-05-31
Operational date2024-05-31
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata