MATEP -3rd CTG (404)

MATEP -3rd CTG is a 14.2 MW gas interconnection project in Suffolk, Massachusetts with a current status of operational. It is proposed to connect at NSTAR Brighton substation.

14.2 MWCapacity
OperationalStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameMATEP -3rd CTG
Queue ID404
Statusoperational
Source statusC
MarketBOST
TechnologyGas
Capacity14.2 MW
StateMassachusetts
CountySuffolk
Point of interconnectionNSTAR Brighton substation
Requested (queue) date2013-01-08
Proposed in-service date
Operational date2017-06-28
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata