McConnellsburg-Cherry Run 138 kV (H27_W72)

McConnellsburg-Cherry Run 138 kV is a 350.0 MW gas interconnection project in Fulton, Pennsylvania with a current status of withdrawn.

350.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMcConnellsburg-Cherry Run 138 kV
Queue IDH27_W72
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity350.0 MW
StatePennsylvania
CountyFulton
Point of interconnection
Requested (queue) date2002-01-31
Proposed in-service date2004-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata