McHenry County Solar Project (AE2-321)

McHenry County Solar Project is a 100.0 MW solar interconnection project in Mchenry, Illinois with a current status of withdrawn. It is proposed to connect at Belvidere-Marengo 138 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameMcHenry County Solar Project
Queue IDAE2-321
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity100.0 MW
StateIllinois
CountyMchenry
Point of interconnectionBelvidere-Marengo 138 kV
Requested (queue) date2019-03-30
Proposed in-service date2021-12-01
Operational date
Withdrawn date2025-11-03
DeveloperMcHenry County Solar Project, LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata