McKean County Solar CSR Phase 2 (1326)

McKean County Solar CSR Phase 2 is a 325.0 MW other interconnection project in McKean, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City - Pierce Brook 345 kV.

325.0 MWCapacity
WithdrawnStatus
AMarket
OtherTechnology

Project facts

Canonical nameMcKean County Solar CSR Phase 2
Queue ID1326
Statuswithdrawn
Source status0
MarketA
TechnologyOther
Capacity325.0 MW
StatePennsylvania
CountyMcKean
Point of interconnectionHomer City - Pierce Brook 345 kV
Requested (queue) date2022-01-20
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.