McLean 345 kV (AE2-173 - moved to TC1)

McLean 345 kV is a 50.0 MW battery interconnection project in McLean, Illinois with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMcLean 345 kV
Queue IDAE2-173 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateIllinois
CountyMcLean
Point of interconnection
Requested (queue) date2019-03-18
Proposed in-service date2022-12-31
Operational date
Withdrawn date2025-11-03
Developer
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata