Meadow Lake 345 kV (AF1-322)

Meadow Lake 345 kV is a 200.0 MW solar interconnection project in White, Indiana with a current status of active.

200.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameMeadow Lake 345 kV
Queue IDAF1-322
Statusactive
Source statusUnder Construction
Market
TechnologySolar
Capacity200.0 MW
StateIndiana
CountyWhite
Point of interconnection
Requested (queue) date2019-09-23
Proposed in-service date2027-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata