Meadow Street 552 Substation - NG Western MA Area Cluster Study (818)
Meadow Street 552 Substation - NG Western MA Area Cluster Study is a 13.4 MW solar interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at NG Meadow Street 552 Substation.
13.4 MWCapacity
WithdrawnStatus
WMAMarket
SolarTechnology
Project facts
| Canonical name | Meadow Street 552 Substation - NG Western MA Area Cluster Study |
|---|---|
| Queue ID | 818 |
| Status | withdrawn |
| Source status | W |
| Market | WMA |
| Technology | Solar |
| Capacity | 13.4 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | NG Meadow Street 552 Substation |
| Requested (queue) date | 2018-12-14 |
| Proposed in-service date | 2022-11-08 |
| Operational date | — |
| Withdrawn date | 2025-06-13 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.