Medford 69kV (W3-031)

Medford 69kV is a 20.0 MW solar interconnection project in Burlington, New Jersey with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMedford 69kV
Queue IDW3-031
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity20.0 MW
StateNew Jersey
CountyBurlington
Point of interconnection—
Requested (queue) date2010-08-30
Proposed in-service date2012-02-06
Operational date—
Withdrawn date2010-10-27
Developer—
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.