Medway 65 110A - 2023 EE GB ASO is a 4.9 MW battery interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Medway 65 110A.

4.9 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameMedway 65 110A - 2023 EE GB ASO
Queue ID1492
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity4.9 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionEversource Medway 65 110A
Requested (queue) date2024-01-26
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata