Medway Grid Battery Storage (844)

Medway Grid Battery Storage is a 250.0 MW battery interconnection project in Norfolk, Massachusetts with a current status of operational. It is proposed to connect at Eversource 345 kV West Medway substation.

250.0 MWCapacity
OperationalStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameMedway Grid Battery Storage
Queue ID844
Statusoperational
Source statusC
MarketSEMA
TechnologyBattery
Capacity250.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionEversource 345 kV West Medway substation
Requested (queue) date2019-03-13
Proposed in-service date
Operational date2026-02-25
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.