Melmore 138kV (AD2-191)

Melmore 138kV is a 170.0 MW wind interconnection project in Seneca, Ohio with a current status of withdrawn.

170.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameMelmore 138kV
Queue IDAD2-191
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity170.0 MW
StateOhio
CountySeneca
Point of interconnection
Requested (queue) date2018-03-30
Proposed in-service date2020-11-02
Operational date
Withdrawn date2020-06-03
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata