Meredosia (J3360)

Meredosia is a 250.0 MW battery interconnection project in Morgan, Illinois with a current status of withdrawn. It is proposed to connect at Meredosia.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMeredosia
Queue IDJ3360
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StateIllinois
CountyMorgan
Point of interconnectionMeredosia
Requested (queue) date2024-04-18
Proposed in-service date2027-01-01
Operational date2027-01-01
Withdrawn date2025-12-23
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata