Meridian 345 kV (AH1-298 - moved to TC2)

Meridian 345 kV is a 75.0 MW battery interconnection project in Whitley, Indiana with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMeridian 345 kV
Queue IDAH1-298 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateIndiana
CountyWhitley
Point of interconnection
Requested (queue) date2021-09-14
Proposed in-service date2030-12-31
Operational date
Withdrawn date2025-12-03
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata