Merom - Gibson 345 kV Line (J2194)

Merom - Gibson 345 kV Line is a 350.0 MW solar interconnection project in Sullivan, Indiana with a current status of withdrawn. It is proposed to connect at Merom - Gibson 345 kV Line.

350.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMerom - Gibson 345 kV Line
Queue IDJ2194
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity350.0 MW
StateIndiana
CountySullivan
Point of interconnectionMerom - Gibson 345 kV Line
Requested (queue) date2021-08-16
Proposed in-service date2024-04-01
Operational date2024-04-01
Withdrawn date2021-12-08
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata