Messenger Brothers Solar II (AH1-591)

Messenger Brothers Solar II is a 50.0 MW solar interconnection project in Grant, West Virginia with a current status of withdrawn. It is proposed to connect at Cherry Ridge 66kV.

50.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameMessenger Brothers Solar II
Queue IDAH1-591
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity50.0 MW
StateWest Virginia
CountyGrant
Point of interconnectionCherry Ridge 66kV
Requested (queue) date2021-09-10
Proposed in-service date2024-12-16
Operational date
Withdrawn date2025-07-08
DeveloperRWE Solar Development, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata