Metro BESS (27INR0478)

Metro BESS is a 200.7 MW other interconnection project in Caldwell, Texas with a current status of operational. It is proposed to connect at 138 kV LYTTON8 (9075).

200.7 MWCapacity
OperationalStatus
CaldwellMarket
OtherTechnology

Project facts

Canonical nameMetro BESS
Queue ID27INR0478
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCaldwell
TechnologyOther
Capacity200.7 MW
StateTexas
CountyCaldwell
Point of interconnection138 kV LYTTON8 (9075)
Requested (queue) date2025-02-25
Proposed in-service date
Operational date2030-12-07
Withdrawn date
DeveloperMetro BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.