Miami Fort 345kV (U1-034)

Miami Fort 345kV is a 4.0 MW other interconnection project in Hamilton, Ohio with a current status of withdrawn.

4.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameMiami Fort 345kV
Queue IDU1-034
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyOther
Capacity4.0 MW
StateOhio
CountyHamilton
Point of interconnection—
Requested (queue) date2008-02-21
Proposed in-service date2008-02-06
Operational date—
Withdrawn date2008-07-18
Developer—
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata