Miami Wabash - Mier 138 kV (J2229)

Miami Wabash - Mier 138 kV is a 100.0 MW battery interconnection project in Wabash, Indiana with a current status of withdrawn. It is proposed to connect at Miami Wabash - Mier 138 kV.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMiami Wabash - Mier 138 kV
Queue IDJ2229
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIndiana
CountyWabash
Point of interconnectionMiami Wabash - Mier 138 kV
Requested (queue) date2021-08-06
Proposed in-service date2024-10-30
Operational date2024-10-30
Withdrawn date2024-10-08
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.