MICOT BESS is a 150.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Tap 345kV 44645 Singleton - 46500 Tomball Ckt 74.

150.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameMICOT BESS
Queue ID25INR0393
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity150.0 MW
State
County
Point of interconnectionTap 345kV 44645 Singleton - 46500 Tomball Ckt 74
Requested (queue) date2023-03-27
Proposed in-service date2025-05-30
Operational date
Withdrawn date
DeveloperUR-Silo DevCo LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.