Middletown 11 (161)
Middletown 11 is a 107.5 MW gas interconnection project in Middlesex, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P Middletown Substation.
107.5 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology
Project facts
| Canonical name | Middletown 11 |
|---|---|
| Queue ID | 161 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Gas |
| Capacity | 107.5 MW |
| State | Connecticut |
| County | Middlesex |
| Point of interconnection | CL&P Middletown Substation |
| Requested (queue) date | 2006-07-05 |
| Proposed in-service date | 2011-06-01 |
| Operational date | — |
| Withdrawn date | 2011-02-10 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.