Middletown 11 (161)

Middletown 11 is a 107.5 MW gas interconnection project in Middlesex, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P Middletown Substation.

107.5 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameMiddletown 11
Queue ID161
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity107.5 MW
StateConnecticut
CountyMiddlesex
Point of interconnectionCL&P Middletown Substation
Requested (queue) date2006-07-05
Proposed in-service date2011-06-01
Operational date
Withdrawn date2011-02-10
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata