Middletown Energy Storage (C24-346)

Middletown Energy Storage is a 100.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Shoemaker-Chester 138kV, Line 27.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameMiddletown Energy Storage
Queue IDC24-346
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyOrange
Point of interconnectionShoemaker-Chester 138kV, Line 27
Requested (queue) date2024-10-12
Proposed in-service date
Operational date
Withdrawn date
DeveloperMiddletown Energy Storage LLC
Utility / transmission ownerO&R

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.