Midlothian Energy Facility (55091_STK2)

Midlothian Energy Facility is a 289.0 MW gas interconnection project in Ellis, Texas with a current status of operational.

289.0 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameMidlothian Energy Facility
Queue ID55091_STK2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity289.0 MW
StateTexas
CountyEllis
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2000-05-01
Withdrawn date
Developer
Utility / transmission ownerMidlothian Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.