Midlothian Unit 3 repower (22INR0543)

Midlothian Unit 3 repower is a 18.0 MW gas interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at 1940 Midlothian ELP 345kV.

18.0 MWCapacity
OperationalStatus
EllisMarket
GasTechnology

Project facts

Canonical nameMidlothian Unit 3 repower
Queue ID22INR0543
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEllis
TechnologyGas
Capacity18.0 MW
StateTexas
CountyEllis
Point of interconnection1940 Midlothian ELP 345kV
Requested (queue) date2021-05-24
Proposed in-service date
Operational date2027-06-03
Withdrawn date
DeveloperMidlothian Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.